Identity area
Reference code
CR-AN-DAF-PROV-AC-000300-C00029
Title
Correspondencia de Planificación. Relación estratégica / Informe Ruta Crítica / Aprobación propuesto metodológica.
Date(s)
- 2009 (Creation)
Level of description
File
Extent and medium
2 cm, clase textual, soporte papel
Context area
Name of creator
Biographical history
Repository
Archival history
Immediate source of acquisition or transfer
Transferencia 02-2017
Content and structure area
Scope and content
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Alternative identifier(s)
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Rules and/or conventions used
Status
Level of detail
Dates of creation revision deletion
2017-05-20
Language(s)
Script(s)
Sources
Archivist's note
Set Durán Carrión